National Highways Authority of India plans to assign the four-laning of existing 2-laning stretch from Wakhri at km. 44.700 to khudus at km. 77.800 (pkg-2) on Mohol-Alandi section (design length 33.100 km) of NH-965 in the state of Maharashtra on EPC.