May 15, 2019 PMC for Water Supply Projects in Gujarat The Project Management Consultancy (PMC) services are sought for construction supervision services pertaining to water supply projects in Gujarat. The projects comprises Water Intake, Transmission Pipeline, Water Treatment, Pumping Station, Pumping Machinery, Storage reservoir for various villages/ULBs in various zones of operation of GWSSB. The completion is targeted in 36 months.
Feb 01, 2018 6.50 MLD Sewage treatment plant at Balasinor Plans to assign the design, supply, construction, installation, testing and commissioning of Sewage Treatment Plant (6.50 MLD) based on Extended Aeration with Biological Nutrient Removal (BNR) at Balasinor, District: Mahisagar, Gujarat. The completion is
Feb 01, 2018 5.0 MLD Sewage treatment plant at Chhota Udepur Plans to assign the design, supply, construction, installation, testing and commissioning of Sewage Treatment Plant (5.0 MLD) based on Extended Aeration with Biological Nutrient Removal (BNR) at Chhota Udepur in Gujarat. The completion is targeted in 15 m
Feb 01, 2018 2.8 MLD Sewage treatment plant at Shehra Plans to assign the design, supply, construction, installation, testing and commissioning of Sewage Treatment Plant (2.8 MLD) based on Extended Aeration with Biological Nutrient Removal (BNR) at Shehra, District: Panchmahal, Gujarat. The completion is tar
Feb 01, 2018 13.71 MLD sewage treatment plant at Dahod Plans to assign the design, supply, construction, installation, testing and commissioning of sewage treatment plant (13.71 MLD) based on Sequential Batch Reactor (SBR) technology with Biological Nutrient Removal (BNR) at Dahod in Gujarat. The completion i
Feb 01, 2018 4.6 MLD Sewage treatment plant at Zalod Plans to assign the design, supply, construction, installation, testing and commissioning of Sewage Treatment Plant (4.6 MLD) based on Extended Aeration with Biological Nutrient Removal (BNR) at Zalod, District: Dahod, Gujarat. The completion is targeted
Oct 01, 2016 Water Treatment Plant In Gujarat Plans to assign designing, constructing, testing and commissioning of water treatment plant,
Sep 30, 2016 Water treatment plant in Gujarat Gujarat Water Supply and Sewage Board plans to assign designing, constructing, testing and commissioning of water treatment plant.
Aug 15, 2016 WTP at Chota Udaypur Plans to assign the designing, constructing, testing and commissioning of Water Treatment Plant (WTP), reinforced cement concrete underground Sumps/ HGLR, reinforced cement concrete elevated storage reservoirs, staff quarters, pump house, compound wall, approach road, providing, lowering, laying, jointing, testing and commissioning of ductile iron pipes, unplasticised polyvinyl chloride pipes for filtered water mains including supply, installation, testing and commissioning (SITC). The work is likely to start in three months and complete in two years.