SEEPZ - Project Reporter - India's Project Database
Projects News » SEEPZ
Result(s) found: 3
Escalators And Elavators Bids For Metro-3 Corridor
16 May 2016
The Mumbai Metro Rail Corporation (MMRC) has invited bids for the construction of escalators and elevators inside the 26 planned underground metro stations of 33.5-km long Colaba-Bandra-Seepz Metro-3 corridor....
Tunnel Ventilation And A/C Contract
16 May 2016
The Mumbai Metro Rail Corporation (MMRC) had earlier invited bids for construction of tunnel ventilation and station air-conditioning as part of 33.5-km long Colaba-Bandra-Seepz Metro-3 corridor project....
Colaba-Bandra-SEEPZ Metro-3 corridor
23 Jun 2015
The Mumbai Metro Rail Corporation (MMRC) has received overwhelming response from national and international companies to construct the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 corridor. In all 31 bids from 9 consortiums have been received by the MMRC for the 7 packages....
1 

Advertise Here [728 W x 90 H pixels]