Highways - Project Reporter - India's Project Database
Projects News » Highways
Result(s) found: 101
Foot Over bridges in Gurgaon – Kotputli
12 Dec 2017
National Highways Authority of India has invited tenders for the Construction of Foot Over Bridges in Gurgaon – Kotputli – Jaipur section of NH-8 from Km 42.700 to Km 273.000 (approx 225.600 km) in the States of Haryana and Rajasthan on EPC mode. The completion is targeted in nine months....
Strengthening of NH-248A in Gurugram
12 Dec 2017
National Highways Authority of India has invited tenders upto 18/12/2017 for Six laning & Strengthening of NH-248A from existing km 2.740 (Rajiv Chowk) to km 11.682 in Gurugram under NHDP Phase-IV in the State of Haryana on Hybrid Annuity Mode. The estimated cost of the project is Rs 695.58 crore....
Six Laning of Bangalore-Nidagatta Section
12 Dec 2017
National Highways Authority of India has invited tenders for Six Laning of Bangalore-Nidagatta Section km. 18.000 to km. 74.200 of NH -275 in the State of Karnataka to be executed on Hybrid Annuity Mode....
Development of Integrated Toll Management System
04 Dec 2017
National Highways Authority of India plans to undertake Development of Integrated Toll Management System....
Development of Dindigul-Kottampati road into NH
27 Nov 2017
Centre has recently approved over Rs 1 lakh crore worth of Highway and Shipping Projects for the state of Tamil Nadu. Around 1300 km of State Highways are being upgraded to National Highways in the state, these include Perambalur - Attur (55 km), Salem-Vanniyampadi (141 km), Thoppur- Mettur-Erode (85 km),Tirupur-Ottanchatiram (91 km)....
Bharatmala project
27 Nov 2017
Bharatmala project is a centrally-sponsored and funded road and highways project of the Government of India. The project entails an investment of around Rs 535,000 crore. Funding of Rs 209,000 crore is targeted through market borrowings, Rs 106,000 crore through private investments, and Rs 219,000 crore shall be raised through the Central Road Fund (CRF) and tolls....
Four laning of Aligarh-Kanpur section
14 Nov 2017
National Highways Authority of India plans to assign four laning of Aligarh-Kanpur section from Km 140.200 (Design chainage 140.200) to Km 186.000 (Design chainage 186.030) (Package-I from Aligarh-Bhadwas)....
Naya Raipur gears up for more development projects
10 Nov 2017
Naya Raipur is a greenfield city located between National Highways NH-6 and NH-43, about 17 km south-east of the current capital Raipur....
NH-24 Extension 4-lane bypass construction project
30 Oct 2017
National Highways Authority of India plans to assign the construction of NH-24 Extension 4-lane bypass starting from Behta Road and terminating at Sitapur Road Chainage 479.500 (bypass chainage from km 32.000/31.490 to km 64.900/64.380 average length 32.895km) in the State of Uttar Pradesh under NHDP Phase-VII-Package 2 on EPC Mode. (Package-II). Bids are invited upto 13th December, 2017....
Rehabilitation of Duburi - Chandikhole Section
30 Oct 2017
National Highways Authority of India plans to assign the Rehabilitation and Up gradation of existing 2-lane to 4-lane standards from Duburi - Chandikhole Section (Ch. 388+000 - Ch. 427+400) of NH 200 (New NH 53) in the State of Odisha on EPC Mode. Bids are currently invited upto 12th December 2017....
1 2 3 4 5 6 7 8 9 10  Next 

Advertise Here [728 W x 90 H pixels]