Result(s) found: 48
4/6 LANING TRICHY TO KARUR SECTION
29 Mar 2017
Design,engineering, finance, construction, operationand maintenance of 4/6 Laning of Trichy to Karur section from km 135.800 (excluding Lalapet ROB) to km 218.028 of NH 67under NHDP phase IIIA on Build, Operate and Transfer (BOT) basis....
4 LANING OF KRISHNAGAR-BAHARAMPORE SECTION
21 Mar 2017
Four laning of Krishnagar-Baharampore section of NH -34 from Km. 115.000 to Km.193.000 in the state of West Bengal under NHDP Phase-III on DBFOT (Annuity)basis (Package No. NHDP-III/BOT/WB/02)....
Four laning of Raiganj – Dalkhola Section
31 Jan 2017
Four laning of Raiganj – Dalkhola Section of NH-34 from Km 398.000 toKm 452.750 in the State of West Bengal under NHDP Phase-III on DBFOT(Toll) basis....
Four laning of Farakka – Raiganj Section
11 Jan 2017
Four laning of Farakka – Raiganj Section of NH-34 from Km 295.000 to Km 398.000 in the State of West Bengal under NHDP Phase-III on DBFOT (Toll) basis....
Four laning of Berhampore – Farakka Section
28 Dec 2016
Four laning of Berhampore – Farakka Section of NH-34 from Km 191.416 to Km 294.684 in the State of West Bengal under NHDP Phase-III on DBFOT (Toll) basis....
Four laning of Ahmedabad to Godhra Section
12 Dec 2016
Four laning of Ahmedabad to Godhra Section of NH 59 from km. 04+200 to km. 122+420 in the State of Gujarat on “DBFOT” basis under NHDP Phase – III....
Four laning of Indore to Gujarat / MP Border Section
06 Dec 2016
Four laning of Indore to Gujarat / MP Border on BOT (Toll) basis from Km.9.500 to Km. 171.000 of NH 59 on DBFOT in the state of Madhya Pradesh under NHDP Phase III....
2 LANING OF KRISHNAGIRI - TINDIVANAM SECTION
25 Oct 2016
Two lane with paved shoulder configuration from Tindivanam (Km.37/600) to Krishnagiri (Km.214.110) Section of NH-66 on DBFOT (Annuity) basis under NHDP phase-III in the state of Tamil Nadu....
6 LANNING OF VADAKKANCHERRY – THRISSURE SECTION
25 Oct 2016
Six laning of Vadakkanchery - Thrissur Section of NH-47 (KM 240 to KM 270)in the State of Kerala (Contract Package: NS2/BOT/KL-03 to be executed asBOT (Toll) on design, build, finance, operate and transfer (DBFOT) patternunder NHDP phase-II...
FOUR LANING OF NAGPUR – SAONER - BETUL SECTION
25 Oct 2016
Four Laning of Nagpur - Saoner - Betul Section of NH -69 from Km. 3.000 ToKm 59.300 in the state Maharashtra and Km 137.000 to Km 257.400 in thestate of Madhya Pradesh on DBFOT (Annuity) basis....
1 2 3 4 5 

Advertise Here [728 W x 90 H pixels]